核桃峪煤矿副立井施工中注浆堵水工程实践
核桃峪煤矿副立井施工中注浆堵水工程实践
摘要:核桃峪煤矿副立井井筒净直径大,在掘砌至80米时井壁出现涌水。由于涌水量很大、井壁质量差,采用传统的水泥、水玻璃浅孔注浆、中深孔注浆均不可行。经研究,该矿采用高分子聚合物注浆堵水为主,水泥一水玻璃浆液注浆堵水为辅的治理措施,取得了很好的效果。
关键词:副立井施工;高分子聚合物注浆堵水;施工
Abstract: walnut coal mine shaft wellbore valley vice net large in diameter, and dig in the build by laying bricks or stones and 80 metres in borehole wall of water gushing. Due to the Great Wall, yield quality is poor, the use of the traditional cement, sodium silicate shallow hole grouting, deep hole grouting in are not feasible. The study, by the high polymer mine water grouting is given priority to, the cement slurry grouting supplemented by a sodium silicate water control measures, and good results have been achieved.
Keywords: vice vertical shaft construction; The high polymer water grouting; construction
1工程背景
华能甘肃能源开发有限公司核桃峪矿区位于正宁县南部,地理坐标范围为东经107°58’05”~108°07’00”,北纬35°14’30”一35°22’30”。东西长约15.429km,南北宽约12.399km。面积191.30km2,煤炭资源量2116.09Mt。
核桃峪煤矿副立井井筒净直径大,为7.0米,井筒在掘砌至80米时井壁出现涌水。副立井是永久工程,同时承担着回风任务,工程质量必须保证。但是,施工过程中由于涌水量过大,井壁质量较差,井壁质量差又造成壁后注浆不能取得理想效果,如此恶性循环,施工进行得异常艰难。井壁涌水量为84 m3/h,淋水主要集中在井深120一142 m段。井壁涌水问题如得不到及时治理,就有可能造成井壁坍塌、井筒扭曲变形等,这将严重威胁矿井安全。
2注浆堵水方法分析
由于涌水量很大、井壁质量差,采用传统的水泥、水玻璃浅孔注浆已经不可行。而水泥、水玻璃中深孔(2.0一3.0 m)注浆存在以下问题:①由于该段井壁质量较差,单纯采用水泥一水玻璃浆液容易产生多处漏浆,注浆效果难以保证。②前期的水泥浆使裂隙的渗透性降低,如继续采用传统的颗粒性注浆材料,则水泥浆液不易渗透到微裂隙内,不容易达到良好的治水效果。③由于围岩破碎,塌孔严重,不易成孔,且经常出现夹钻现象,给造孔、安装注浆管等带来很多困难。④低压注浆可实现注浆锚杆加固井壁及围岩,但无法实现浆液扩散治水;高压注