电气工程施工方案中英文 ,电气施工方案。
。
欢迎下载!
电气安装质量控制点及控制措施 Quality Control Point and Control Measure on Electric Installation
分项工程
Sub-item 质量控制点
Quality Control Point 质量控制措施
Quality Control Measure 备注
Remark
施工准备 Construction Preparation 材料计划、材料送审、施工方案
Material plan, material review and approval, and construction program 认真编制
Work out carefully
明管安装
Open–pipe installation 位置、标高正确、接地良好
The position and elevation are correct, and the grounding is good 绘制综合图及管路接地大样图
Draw integrated drawing and detail of pipeline grounding
桥架线槽安装
Installation on crane span structure slot 标高准确、吊架安装、穿墙、楼板的防火处理、与其它专业管道的间距
Correct level, installation on hanger frame, fire protection treatment of through-wall and floor, clearance with other special pipeline 绘制综合图、吊架安装图、防火处理大样图
Draw integrated drawing, installation drawing of hanger frame, and detail of fire protection treatment
穿线配线
Threading distribution 接线正误、导线涮锡、导线损伤
Wiring correct error, conducting wire with rinsing tin, conducting wire with damage 严格执行接线图、涮锡
穿线时注意保护导线
Strictly carry out wiring drawing, rinsing tin, pay attention to protecting the wire when threading
电缆敷设
Cable lay 电缆平直、固定牢固、电缆弯扁度、标识
Straight cable, firm fixing, cable bending, and identification 落实图纸、规范相关要求
Implement requirements relating to drawing and specification
焊接点
Soldered dot 焊接部位的接地电阻、焊点表面光滑饱满
Ground resistance at welded position, and the surface at welded point is smooth and full 焊接完成后测试焊接部位的接地电阻
Test the ground resistance of welded position after finishing the welding.
器具安装
Appliance installation 位置正确、安装牢固、观感良好
The position is correct and installed firmly, the appearance is good. 按绘制的机电综合图、表面器具布置平面图安装
Arrange the plan installation according to electromechanical drawn integration di
防雷与接地施工 位置正确、安装牢固、观感良好 按绘制的机电综合图、表面器具布 调 电气工 管路暗敷程 Thepositioniscorrectandinstalled置平面图安装 施 器具安装 管内穿线器具安装 工 firmly,theappearanceisgood.Arrangetheplaninstallation Electric管路明敷
。
欢迎下载!
电气安装质量控制点及控制措施 Quality Control Point and Control Measure on Electric Installation
分项工程
Sub-item 质量控制点
Quality Control Point 质量控制措施
Quality Control Measure 备注
Remark
施工准备 Construction Preparation 材料计划、材料送审、施工方案
Material plan, material review and approval, and construction program 认真编制
Work out carefully
明管安装
Open–pipe installation 位置、标高正确、接地良好
The position and elevation are correct, and the grounding is good 绘制综合图及管路接地大样图
Draw integrated drawing and detail of pipeline grounding
桥架线槽安装
Installation on crane span structure slot 标高准确、吊架安装、穿墙、楼板的防火处理、与其它专业管道的间距
Correct level, installation on hanger frame, fire protection treatment of through-wall and floor, clearance with other special pipeline 绘制综合图、吊架安装图、防火处理大样图
Draw integrated drawing, installation drawing of hanger frame, and detail of fire protection treatment
穿线配线
Threading distribution 接线正误、导线涮锡、导线损伤
Wiring correct error, conducting wire with rinsing tin, conducting wire with damage 严格执行接线图、涮锡
穿线时注意保护导线
Strictly carry out wiring drawing, rinsing tin, pay attention to protecting the wire when threading
电缆敷设
Cable lay 电缆平直、固定牢固、电缆弯扁度、标识
Straight cable, firm fixing, cable bending, and identification 落实图纸、规范相关要求
Implement requirements relating to drawing and specification
焊接点
Soldered dot 焊接部位的接地电阻、焊点表面光滑饱满
Ground resistance at welded position, and the surface at welded point is smooth and full 焊接完成后测试焊接部位的接地电阻
Test the ground resistance of welded position after finishing the welding.
器具安装
Appliance installation 位置正确、安装牢固、观感良好
The position is correct and installed firmly, the appearance is good. 按绘制的机电综合图、表面器具布置平面图安装
Arrange the plan installation according to electromechanical drawn integration di
防雷与接地施工 位置正确、安装牢固、观感良好 按绘制的机电综合图、表面器具布 调 电气工 管路暗敷程 Thepositioniscorrectandinstalled置平面图安装 施 器具安装 管内穿线器具安装 工 firmly,theappearanceisgood.Arrangetheplaninstallation Electric管路明敷
热门推荐
点击排行
猜你还喜欢
-
河北省2022年扬尘污染防治工作方案
- 所属分类:其他资料2
- 更新时间:2023-11-01
- 浏览次数:0
- 河北省2022年扬尘污染防治工作方案为深入打好大气污染防治攻坚战,持续强化扬尘污染防治,不断提升精细化管理水平,进一步降低 PM10平均浓度和降尘量,根据《河北省 2022 年大气污染综合治理工作要点》《河北省深入实施大气污染综合治理十条措施》,
-
厂房电气图纸
- 所属分类:电气图纸
- 更新时间:2023-10-29
- 浏览次数:0
- 厂房电气图纸工业厂房施工图纸,请参考
-
某项目混凝土专项施工方案2018
- 所属分类:施工组织设计
- 更新时间:2023-11-01
- 浏览次数:0
- 某项目混凝土专项施工方案2018拟建场地位于重庆市北滨西侧北滨路片区,根据设计单位提供的总平面图及设计施工图,拟建项目共48栋建筑物。其中有25栋高层建筑为住宅、酒店等,主体楼层数为15层~31层,裙楼商业用房的楼层数为1~4层。主楼的结构类
-
GB55032-2022建筑与市政工程施工质量控制通用规范
- 所属分类:建筑文件
- 更新时间:2023-10-31
- 浏览次数:0
- GB55032-2022建筑与市政工程施工质量控制通用规范GB55032-2022建筑与市政工程施工质量控制通用规范,有需要的可以下载
-
动火施工方案经典
- 所属分类:其他资料2
- 更新时间:2023-10-20
- 浏览次数:0
- 动火施工方案经典
-
深基坑专家论证方案
- 所属分类:施工方案
- 更新时间:2023-10-08
- 浏览次数:0
- 深基坑专家论证方案多边不规则基坑。场地标高起伏较大。
-
XXX园项目大跨度高悬空结构支模平台专项施工方案-中建
- 所属分类:施工方案
- 更新时间:2023-10-27
- 浏览次数:0
- XXX园项目大跨度高悬空结构支模平台专项施工方案-中建本方案属于模板支撑体系应用领域,聊城碧桂园·国岳府项目 6#、7#、8#、17#楼为剪力墙结构,建筑高度 99-103.4m。屋面层(标高+90.8m/+99m)及机房层(标高+95.65m/+103.4m)存在框架梁及结构板,梁板最大跨度 11.05m,外
-
电力建设土建工程施工、试验及验收标准表式 第1部分
- 所属分类:专业资料
- 更新时间:2023-11-01
- 浏览次数:0
- 电力建设土建工程施工、试验及验收标准表式 第1部分 电力建设土建工程施工、试验及验收标准表式 第1部分 施工2013。此规范可作为施工表格填写的依据
-
000尧都区汾河东岸(平阳桥—南环路斜拉桥)污水管线
- 所属分类:其他资料2
- 更新时间:2023-10-05
- 浏览次数:0
- 000尧都区汾河东岸(平阳桥—南环路斜拉桥)污水管线泵站维护修缮
-
山东省建设工程施工仪器仪表台班费用编制规则
- 所属分类:专业资料
- 更新时间:2023-09-21
- 浏览次数:0
- 山东省建设工程施工仪器仪表台班费用编制规则山东省住房和城乡建设厅关于发布《山东省建筑工程消耗量定额》、 《山东省安装工程消耗量定额》、《山东省市政工程消耗量定额》、 《山东省园林绿化工程消耗量定额》、《山东省建设工程施工机械台班费用编制规则》、
-
山东省建设工程施工机械台班费用编制规则
- 所属分类:专业资料
- 更新时间:2023-09-21
- 浏览次数:0
- 山东省建设工程施工机械台班费用编制规则山东省住房和城乡建设厅关于发布《山东省建筑工程消耗量定额》、 《山东省安装工程消耗量定额》、《山东省市政工程消耗量定额》、 《山东省园林绿化工程消耗量定额》、《山东省建设工程施工机械台班费用编制规则》、
-
联合站站内试压方案
- 所属分类:施工组织设计
- 更新时间:2023-09-16
- 浏览次数:0
- 联合站站内试压方案本试压方案,适用于油田地面产能建设项目,联合站建设试压运行,本方案编著根据实际设计图纸,施工现场实际情况进行编制,可参考用于相类似项目建设使用。
-
高大模板工程设计与施工专项方案编制指南
- 所属分类:施工组织设计
- 更新时间:2023-09-16
- 浏览次数:0
- 高大模板工程设计与施工专项方案编制指南目 录 一、编制说明 1 1.1 编制依据 1 1.2 编制人员 1 1.3 发放范围 1 二、工程概况 2 2.1 工程概况 2 2.2 高大模板工程概况和特点 2 2.3 施工平面布置 4 2.4 施工要求和技术保证条件 4 三、施工计划 6 3.1 施工进度