日志 ,33。
欢迎下载!
日期 施工情况 6.19 上午6-12时测量,12时进行开工破土奠基仪式 6.20 开挖DK0+240-DK0+300桩点左侧的渣土 6.21 开挖DK0+240-DK0+300桩点左侧的渣土 6.22 开挖DK0+240-DK0+300桩点左侧的渣土 6.23 开挖DK0+300-DK0+340桩点左侧的渣土,灌木丛 6.24 确认DK0+080-DK0+120桩点为填方路段并对其进行扫障 6.25 上午对DK0+120-DK0+160左侧取土挖方,对DK0+080-DK0+120回填碾压 下午铲除DK0+500-DK0+620右侧上部的障碍 6.26 上午DK0+380-DK0+620桩点施工放线,下午在DK0+740-DK0+840右侧按1:1坡度挖铲剔坡 6.30 上午对中心桩点保护定位,下午开挖DK0+400-DK0+420桩点的渣土 7.1 对DK0+60-DK0+120桩点右侧填方碾压 7.2 挖运DK0+400-DK0+420石渣,回填DK0+60-DK0+120右侧 7.7 挖方回填DK0+500-DK0+620,DK0+60-DK0+120桩点 7.8 挖方回填碾压DK0+500-DK0+620,DK0+60-DK0+120桩点 7.12 挖方回填碾压DK0+500-DK0+620右侧石渣,DK0+980-DK0+940左侧土方 7.13 挖方回填碾压DK0+500-DK0+620右侧石渣,DK0+980-DK0+940左侧土方DK0+005桥涵中板8块 7.14 挖方回填碾压DK0+500-DK0+620右侧石渣,DK0+980-DK0+940左侧土方DK0+005桥涵边板2块 7.15 挖运DK0+500-DK0+620右侧石渣,回填DK0+980-DK0+940左侧土方 7.16 挖运DK0+500-DK0+620右侧石渣,回填DK0+980-DK0+940左侧土方 7.17 挖运回填DK0+420-DK0+450右侧石渣 7.18 挖运DK0+740-DK0+760右侧石渣 7.19 挖运DK0+720-DK0+800右侧石渣 7.20 挖运DK0+720-DK0+840右侧石渣 7.21 上午挖运DK0+720-DK0+840右侧石渣,下午翻挖碾压DK0+340-DK0+400右侧,挖刷外运DK0+460-DK0+620右侧石渣 7.22 翻挖碾压DK0+320-DK0+380,挖刷翻挖碾压DK0+420-DK0+580 7.23 挖运DK0+620-DK0+840右侧石渣,回填碾压DK0+340-DK0+400右侧

下载地址

进入下载页
文件大小
50.5KB
上传作者
雅雅
文件类型
.doc

健康绿色上网,共建和谐网络环境,禁止发布任何违法信息